Yes, cementitious waterproofing coatings are specifically designed to be tiled over once fully cured.
A typical roof waterproofing project takes 3-5 days depending on the area size and system used. This includes surface preparation, application, and curing time.
Anti-corrosive coating is a protective layer applied to metal surfaces to prevent corrosion and extend the service life of steel structures and pipework.
SBR admixture is used to improve the bonding strength, water resistance, and flexibility of concrete and mortar in repair and waterproofing applications.